• Estimate Request for Building Move

  •  -
  • What is your estimate request for ?*
  • Does the building have any additions?*
  • If yes, does the addition floor joists run the same direction as the main floor joists?
  • Check if building has any of the following.*
  • We will require pictures of the following:

    • A picture of each side of the building
    • Pictures of the access/driveway at both locations if possible
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • If you have problems with uploads please email images to holmesbuildingmovers@gmail.com

  • An estimate will be provided within 2 business days. If you choose to proceed with a firm quote we will be happy to make arrangements for a site visit.

  • Should be Empty: